Electric power control system and process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9274513
APP PUB NO 20140188301A1
SERIAL NO

14201343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for controlling electric power supplied to one or more electrical devices from a power source are disclosed. Measurements of the supplied electricity are detected. Estimated deviant voltage levels that the supplied electricity will not drop below or exceed as a result of varying electrical consumption by the one or more electrical devices is computed based on a predetermined confidence level and the detected measurements. A voltage level output of the electricity supplied to the electrical device is adjusted based on the computed deviant voltage level.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTILIDATA INC245 CHAPMAN STREET SUITE 200 PROVIDENCE RI 02905

International Classification(s)

loading....
  • 2014 Application Filing Year
  • H02J Class
  • 3785 Applications Filed
  • 3269 Patents Issued To-Date
  • 86.37 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201420152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bell, David G Spokane, US 27 928

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 2 Citation Count
  • H02J Class
  • 11.45 % this patent is cited more than
  • 9 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges56313722595133201 - 1011 - 2021 - 3031 - 4041 - 5051 - 6061 - 7071 - 8081 - 90020406080100120140160180200220240260280300320340

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2027