Phase shift circuit and power factor correction circuit including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9270165
APP PUB NO 20140177295A1
SERIAL NO

13892033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a phase shift circuit and a power factor correction circuit including the same. The phase shift circuit includes a switching circuit unit charging power in or discharging power from a capacitor through a plurality of switching devices and comparing a voltage of the capacitor with a predetermined reference voltage, and a clock generating unit generating a reference clock signal based on an output of the switching circuit unit, wherein the switching circuit unit turns the plurality of switching devices on or off, based on currents from inductors respectively included in a main circuit and a sub-circuit of a power factor correction circuit to determine a polarity of the voltage of the capacitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SKAICHIPS CO LTDGYEONGGI-DO 16419

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hwan Gyunggi-do, KR 28 74
Choi, Joong Ho Gyeonggi-do, KR 20 218
Jang, Yu Jin Gyunggi-do, KR 30 217
Moon, Young Jin Gwangju, KR 32 412
Park, Jeong Pyo Gyeonggi-do, KR 4 17
Roh, Yong Seong Incheon, KR 11 312
Yang, Jeong Mo Gyunggi-do, KR 11 35
Yoo, Chang Sik Seoul, KR 46 604

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00