Continuous steam generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9267678
APP PUB NO 20110197830A1
SERIAL NO

13062700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous steam generator including a combustion chamber with a plurality of burners for fossil fuel is provided. A vertical gas duct is connected downstream of the combustion chamber on the hot gas side, in an upper region via a horizontal gas duct. The outside wall of the combustion chamber is formed from evaporation pipes which are welded together in a gas-tight manner and mounted upstream of a water separator system on the flow medium side and from superheater pipes which are welded together in a gas-tight manner and mounted downstream of the water separator system. The water separator system includes a plurality of water separation elements, each element includes an inlet tube which is connected to the respective upstream evaporation for tubes, which extend into a water evacuation tube. A distributer element is arranged on the evaporator side between the respective water separator element and the inlet collector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brückner, Jan Uttenreuth, DE 42 174
Effert, Martin Erlangen, DE 23 49
Franke, Joachim Nürnberg, DE 61 482

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00