Opto-electric device and method of manufacturing an opto-electric device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9263700
APP PUB NO 20140049825A1
SERIAL NO

13881441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An opto-electric device is presented that comprises an opto-electric element enclosed by a barrier structure for inhibiting a transmission of moisture from an environment towards the opto-electric element. The barrier structure includes a stack of layers comprising at least an inorganic layer and a moisture getter material in a layer arranged between the inorganic layer and the opto-electric element. The stack includes a lateral diffusion layer, wherein the getter material is present in a separate getter layer arranged between the opto-electric element and the lateral diffusion layer and/or the getter material is present in the lateral diffusion layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEDERLANDSE ORGANISATIE VOOR TOEGEPAST-NATUURWETENSCHAPPELIJK ONDERZOEK TNO'S-GRAVENHAGE
KONINKLIJKE PHILIPS N VHOLLAND IAN DEHO FINN EINDHOVEN NORTH BRABANT
HUNTSMAN ADVANCED MATERIALS (SWITZERLAND) GMBHSWITZERLAND ZUG ZUG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kotzev, Dimiter Lubomirov Basel, NL 18 339
van, de Weijer Peter Heeze, NL 25 301
van, Mol Antonius Maria Bernardus Eindhoven, NL 26 158

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00