Non-volatile memory device, electronic control system, and method of operating the non-volatile memory device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9262099
APP PUB NO 20140223080A1
SERIAL NO

14009213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a non-volatile memory device, an electronic control system, and a method of operating the non-volatile memory device. A non-volatile memory device according to an embodiment of the present invention includes a first NAND cell array including a first group of pages, and a second NAND cell array including a second group of pages. A plurality of X-decoders are at least one-to-one connected to the first and second NAND cell arrays. A control logic controls the plurality of X-decoders to simultaneously sense data of a first page corresponding to a start address from among the first group of pages, and data of a second page subsequent to the first page from among the second group of pages.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED MEMORY TECHNOLOGY (JIANG SU) LIMITEDC5-401-03 FILI CENTER XINYUAN ROAD WUXI ECONOMIC DEVELOPMENT ZONE WUXI CITY JIANGSU PROVINCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Yong Soo Gyeonggi-do, KR 98 962
Seo, Myoung Kyu Gyeonggi-do, KR 7 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00