Rock and concrete breaking (demolition—fracturing—splitting) system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9261342
APP PUB NO 20150040788A1
SERIAL NO

13992761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention is related to a controlled expanding chemical (CEC) and its activation system. In this invention the mixture of chemicals activated by a totally electronic/electrical system to break (fracture-demolish-split) rock and concrete and hard formations; without creating any shock waves, fly-rock, vibrations and without producing hazardous gases and having no damage or harm for human and living things comprises chlorates selected from magnesium chlorate, sodium chlorate, barium chlorate, potassium chlorate as alone or mixture of two or more with ratio of 30-70% by weight of mixture, oxalates selected from calcium oxalate, ferrous oxalate, lithium oxalate, potassium oxalate, sodium oxalate, ammonium oxalate, ferric ammonium oxalate, ferric sodium oxalate, ferric potassium oxalate as alone or mixture of two or more with ratio of 5-35% by weight of mixture, sugar or lactose or starch or any combination of them with ratio of 10-40% by weight of mixture, boron oxide (boroxide) (B2O3) with ratio of 2-25% by weight of mixture, and borax decahydrate (Na2B4O7.10H2O) with ratio of 1-20% by weight of mixture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALBAKRI SAMI ABDULRAHMAN A2342 -6233 JEDDAH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Albakri, Sami Abdulrahman A Jaddah, SA 2 7
Ozalp, Yusuf Vasfi Ankara, TR 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00