Method for converting a ballasted track into a slab track

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9260821
APP PUB NO 20140158785A1
SERIAL NO

14087093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a section of a ballasted track that extends over a plurality of crossties, ballast is removed and crossties are removed. Crosstie blocks mounted in concrete slabs are inserted, lifted, and fastened to the rails. The rails are supported by temporary, vertically adjustable supports and adjusted. In an area that extends over a number of concrete slabs, infill concrete is filled in from the underground up to at least part of the height of the concrete slabs, and after the infill concrete has hardened, at least a part of each of the supports located between two respective concrete slabs is removed. The method allows the conversion to be carried out without changing the position of the rails. After the placement of the supports, the track is immediately operable again so that the relevant section need not remain closed until all method steps are completed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SONNEVILLE AG4542 LUTERBACH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fink, Martin Bern, CH 20 138
Habegger, Marco Bern, CH 3 3
Laborenz, Peter Lüscherz, CH 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00