Full butt joint structure of connection joint between side frame and cross beam of bogie frame and assembly welding process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9260119
APP PUB NO 20130213258A1
SERIAL NO

13852905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A full butt joint structure of a connection joint between a side frame and a cross beam of a bogie frame, characterized in: the side frame is connected to the cross beam by a connecting seat to realize the full butt joint, a side frame connecting end of the connecting seat, a transport column and a side frame inside vertical plate form a plate-plate butt joint structure, and a cross beam connecting end of the connecting seat and the cross beam form a tube-tube butt joint structure. An assembly welding process comprises: the connecting seat is assembled and welded to the cross beam; a cross beam unit is assembled and welded; the connecting seat is assembled and welded to the transport column and the side frame inside vertical plate; a side frame strengthen partition plate is assembled and welded to an upper plate; and the bogie frame is welded.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANGCHUN RAILWAY VEHICLES CO LTD130062 JILIN PROVINCE CHANGCHUN CITY GREEN YAM ROAD NO 435 CHANGCHUN CITY JILIN PROVINCE 130062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Li Changchun, CN 17 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00