Energy-absorbing support structure and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9260070
APP PUB NO 20140361562A1
SERIAL NO

14371832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy-absorbing support structure has an absorbing body including a fiber-reinforced plastics material. The latter is arranged between a support structure abutment component and a support structure impact-absorbing component. The absorbing body absorbs energy by deforming from a starting state into a deformed deformation state based on an impact-induced relative displacement of the support structure components, the energy being introduced into the support structure by an impact. The absorbing body is configured as a body which has already been predeformed in the starting state by energy absorption compared to an original state. During production of the support structure, the absorbing body is firstly produced in the original state, the latter is then predeformed into the starting state and finally the absorbing body is connected to the support structure components. The result is a support structure which absorbs energy in a predictable and defined manner upon an impact-induced introduction of energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVESTRO THERMOPLAST COMPOSITE GMBH91477 MARKT BIBART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Börger, Herbert Langenfeld, DE 6 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00