Microstructured optical fibre having a large core and a flattened fundamental mode, production method thereof and use of same in laser microfabrication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9244219
APP PUB NO 20140233900A1
SERIAL NO

14346309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The fiber comprises a core (2) having an index N and diameter of 10 μm or more, surrounded by a ring (4) having an index N+Δn and thickness ΔR, and cladding (6) surrounding the ring and comprising for example air gaps (8). According to the invention: Δn≧10−3 and ΔR=α/(Δn)β [1] where: 5×10−4 μm≦α≦5×10−2 μm and 0.5≦β≦1.5. The numbers α and β are dependent on the wavelength λ of the light guided by the fiber, the number of missing gaps therein, the diameter d of the gaps, the spacing Λ thereof and N. To design the fiber, λ, the number of missing gaps, d/Λ, the core doping content, Λ and Δn are chosen; and ΔR is determined using equation [1] so as to obtain a flattened fundamental mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE3 RUE MICHEL-ANGE 75794 PARIS CEDEX 16 75794
UNIVERSITE LILLE 1 SCIENCES ET TECHNOLOGIESCITE SCIENTIFIQUE VILLENEUVE D'ASCQ CEDEX 59655

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bigot, Laurent Hellemmes, FR 7 257
Bouwmans, Géraud Velleneuve d'Ascq, FR 4 243
Hugonnot, Emmanuel Talence, FR 5 250
Lago, Laure Le Barp, FR 1 241
Mussot, Arnaud Hellemmes, FR 6 259
Quimquenpois, Yves Marquette lez Lille, FR 1 1
Valentin, Constance Croix, FR 2 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00