Method and apparatus for bulk seafloor mining

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9243496
APP PUB NO 20130298430A1
SERIAL NO

13805188

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A seafloor bulk mining tool for production cutting of a seafloor bench. The tool uses a tracked locomotion system to travel across a seafloor bench. Power and control interfaces receive power and control signals from a surface source. The tool has a drum cutter for cutting the bench, and a sizing grill adjacent the drum cutter for sizing cuttings as they are produced by the drum cutter. A drum shroud may also be provided to help contain cuttings. A suction inlet can be used to capture cuttings as they are produced, for example in conjunction with a spade and augers.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EDA KOPA (SOLWARA) LIMITEDSECTION 45 SIR HUBERT MURRAY HIGHWAY LEVEL 3 PETROMIN HAUS LOT 4 PORT MORESBY 111

International Classification(s)

loading....
  • 2011 Application Filing Year
  • E02F Class
  • 359 Applications Filed
  • 309 Patents Issued To-Date
  • 86.08 % Issued To-Date

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berndt, Roland Gunter Milton, AU 10 26
Howitt, Michael Milton, AU 6 20
Inglis, Antony Eliot Milton, AU 3 20
Jaffers, Daal Hallam Milton, AU 6 19
Jones, Glen Robert Milton, AU 5 26
Maskell, Ian Wallsend, GB 1 6
O'Sullivan, Anthony Paul Milton, AU 3 20
Ridley, Nicholas William Wallsend, GB 2 12
Smith, Glen Milton, AU 10 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 2 Citation Count
  • E02F Class
  • 15.49 % this patent is cited more than
  • 9 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges221109101 - 1011 - 2031 - 4005101520253035404550556065707580859095100105110115120

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2027