DC/DC converter, power converter and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9236807
APP PUB NO 20120250358A1
SERIAL NO

13427450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A DC/DC converter, a power converter and a control method thereof are disclosed, where the DC/DC converter includes an output circuit, a rectangular wave generator, a resonant tank, a detection unit and a control unit. The output circuit has a load. The rectangular wave generator converts an input voltage into at least one rectangular wave. The resonant tank provides a first voltage based on the rectangular wave for the output circuit. The detection unit detects a signal related to a state of the load. When the state of the load is light-load or a no-load, the control unit controls a working frequency or a duty ratio of the rectangular wave, so that the duty ratio of the rectangular wave is within a predetermined range, in which a voltage gain of the DC/DC converter is greater than another voltage gain under the condition of 50% duty ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELTA ELECTRONICS (SHANGHAI) CO LTD1F&7F&8F BUILDING 1 NO 1675 HUADONG ROAD PUDONG SHANGHAI 201209

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gan, Hong-Jian Shanghai, CN 35 292
Hu, Pei-Qing Shanghai, CN 8 34
Jin, Hong-Yuan Shanghai, CN 9 43
Ying, Jian-Ping Shanghai, CN 73 643

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00