Heating a furnace for the growth of semiconductor material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9236281
APP PUB NO 20140248739A1
SERIAL NO

14234357

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-ingot furnace for the growth of crystalline semiconductor material has one or more heating devices for heating a hot zone in which crucibles containing semiconductor material are received. At least one of the heating devices is arranged to apply a predetermined differential heat flux profile across a horizontal cross-section of the semiconductor material in one or more of the crucibles, the predetermined differential heat flux profile being selected in dependence the position of the one or more crucibles in an array. In this manner, the heating device can at least partially compensate for differences in the temperature across the semiconductor material that arises from its geometric position in the furnace. This reduces the possibility of defects such as dislocations during the growth of a crystalline semiconductor material. Associated methods are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REC SOLAR PTE LTD20 TUAS SOUTH AVENUE 14 SINGAPORE 637312

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bakke, Per Porsgrunn, NO 5 14
Homayonifar, Pouria Porsgrunn, NO 2 10
Teixeira, Alexandre Sandnes, NO 2 10
Vladimirov, Egor Brevik, NO 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00