Electric motor system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9231513
APP PUB NO 20120187893A1
SERIAL NO

13259616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor system including: a rotor (9); a stator (8); the rotor and the stator being mounted for movement relative to one another; the rotor having multiple magnetic poles (11); the stator having multiple salient poles (12) facing the magnetic poles; a first coil set (1A) and a second coil set (1B); the first coil set having three phases, each of the phases comprising a first coil (u1, v1, w1) and a second coil (u1 v1′, w1′) connected in series and wrapped around different of the salient poles in different directions relative to the rotor; the second coil set having three phases, each of the phases comprising a first coil (u2, v2, w2) and a second coil (u2′, v2′, w2′) connected in series and wrapped around different of the salient poles in different directions relative to the rotor; a driver (2) configured to drive the first coil set with a first three-phase voltage (U1, V1, W1) and to drive the second coil set with a second three-phase voltage (U2, V2, W2); the driver configured to drive the first phase of the first three-phase voltage and the first phase of the second three-phase voltage with a relative phase shift.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOOG JAPAN LTDKANAGAWA 254-0019

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Tsutomu Fujisawa, JP 38 288
Fujiwara, Kenji Fujisawa, JP 80 603

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00