Hybrid cycle SOFC-inverted gas turbine with CO2 separation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9228494
APP PUB NO 20120117979A1
SERIAL NO

13382033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A new gas turbine-fuel cell Hybrid Cycle is proposed. The fuel cell advantageously operates close or under atmospheric pressure and is fully integrated with the gas turbine that is based on an Inverted Brayton-Joule Cycle. The idea of the invention is to capitalize on the intrinsic oxygen-nitrogen separation characteristic of the fuel cell electrolyte by sending to the Inverted Brayton-Joule Cycle only the anodic flow, which is the one free of nitrogen. In this way the flow that expands in the turbine consists only in steam and carbon dioxide. After the expansion the steam can be easily condensed, separated and pumped up. Therefore the compressor has mainly only to compress the separated carbon dioxide. This effect generates a substantial advantage in term of efficiency and enables separating the carbon dioxide. The new proposed Hybrid Cycle enables to: substantially increase the system efficiency compared to the known gas turbine-fuel cell Hybrid Cycle, maintain the fuel cell operating under or close to atmospheric pressure and separate the carbon dioxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLE POLYTECHNIQUE FEDERALE DE LAUSANNE (EPFL)EPFL INNOVATION PARK J LAUSANNE 1015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Facchinetti, Emanuele Ecublens, CH 5 29
Favrat, Daniel Epalinges, CH 6 178
Marechal, François Orbe, CH 3 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00