Apparatus with two-chamber structure for growing silicon carbide crystals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9228275
APP PUB NO 20120192790A1
SERIAL NO

13379608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus with two-chamber structure for growing silicon carbide (SiC) crystals is disclosed. The apparatus comprises a sample feed chamber and a crystal growth chamber, both of which are separately connected with each other by a vacuum baffle valve and connected with a vacuum system. The crystal growth apparatus ensures that the insulation materials in the crystal growth chamber cannot contact with air, minimizes the adsorption of nitrogen and pollutants on the insulation materials and the growth chamber, improves purity of SiC crystals and achieves precise control of the impurities so that growth of high-quality SiC crystals such as conductive, doped semi-insulating or high-purity semi-insulating SiC crystals and the like is enabled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANHUI WEIXIN CHANGJIANG SEMICONDUCTOR MATERIAL CO LTDXIHUSAN ROAD ECONOMIC ZONE TONGLING CITY ANHUI PROVINCE 244000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zhizhan Shanghai, CN 1 1
Shi, Erwei Shanghai, CN 4 1
Xiao, Bing Shanghai, CN 34 139
Yan, Chengfeng Shanghai, CN 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00