Terminal connecting-and-fixing structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9225080
APP PUB NO 20140349527A1
SERIAL NO

14371469

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A terminal connecting-and-fixing structure capable of ensuring the connection between the terminal and the bus bar even in the case of loose of the bolt and suppressing increase in the contact resistance, thereby preventing poorness of the conduction, is provided. A terminal connecting-and-fixing structure comprises a bus bar 10 having a plate-like shape, a bolt 30 penetrating the bus bar 10, and a nut 40 tightened by the bolt 30, and a terminal 20 mounted on the bolt 30, wherein the terminal 20 and the bus bar 10 is connected and fixed by fastening the nut 40 to the bolt 30, and wherein the bus bar 10 has a concave portion 12, and the terminal 20 and the bus bar 10 is connected and fixed by fastening the nut 40 to the bolt 30 while an end portion of the terminal 20 is press-fitted in the concave portion 12.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI NICHIYU FORKLIFT CO LTD1-1 2-CHOME HIGASHIKOTARI NAGAOKAKYO-SHI KYOTO 617-8585

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Himeno, Takamitsu Tokyo, JP 13 88
Kawauchi, Naoto Tokyo, JP 16 58
Matsuda, Satoshi Tokyo, JP 94 871
Nakao, Atsushi Tokyo, JP 22 159
Tamaki, Hitoshi Tokyo, JP 13 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00