Hydrogen production system for controlling the power output of power stations based on renewable energy sources and control process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222459
APP PUB NO 20130093194A1
SERIAL NO

13640674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It stands out mainly for consisting of a nested configuration of electrolysis units (5), independently operated, the nominal power values of which are descendant in such a manner that, for any unit of the system, the sum of the nominal power of the smaller electrolysis units (5) is always greater than or equal to the “dead band” (DB) of said units, allowing reduction of the dead band of said hydrogen production system (4) to negligible levels, avoiding loss or discharge of the energy generated in said renewable power stations, preferably one or several wind farms (2) formed by a group of wind turbines (1), connected to the power grid (3) as a consequence of the implementation of a primary control service therein or, in general, of any other active power control service, thereby optimizing the total energy obtained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INGETEAM POWER TECHNOLOGY S A48170 ZAMUDIO (BIZKAIA)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guelbenzu, Michelena Eugenio Sarriguren, ES 6 26
Marroyo, Palomo Luis Pamplona, ES 11 70
Pérez, Barbáchano Javier Sarriguren, ES 3 21
Sánchez, Mayayo Israel Pamplona, ES 1 5
Sanchis, Gúrpide Pablo Pamplona, ES 2 5
Ursúa, Rubio Alfredo Pamplona, ES 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00