Power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222410
APP PUB NO 20120260667A1
SERIAL NO

13347358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant is provided and includes a gas turbine engine to generate power, a heat recovery steam generator (HRSG) to produce steam from high energy fluids produced from the generation of power in the gas turbine engine, a steam turbine engine to generate additional power from the steam produced in the HRSG and a thermal load reduction system to reduce thermal loading of components of the HRSG and/or the steam turbine engine during at least startup and/or part load operations, which includes an eductor by which a mixture of compressor discharge air and entrained ambient air is injectable into the HRSG and/or an attemperator to cool superheated steam to be transmitted to the steam turbine engine and a detector disposed within the HRSG to facilitate identification of hot spots therein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chillar, Rahul Jaikaran Marietta, US 25 1047
Chriswindarto, Wulang Edwien Kennesaw, US 5 64
Ekanayake, Sanji Mableton, US 142 1041
Mestroni, Julio Enrique Marietta, US 23 304
Nenmeni, Vijay Raghavendran Atlanta, US 3 92
Pandey, Achalesh Kumar Greenville, US 40 1129
Rogers, David Lee Marietta, US 7 129
Salter, Morgan Carthledge Acworth, US 1 40
Srivastava, Ajit Atlanta, US 3 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00