Power screwdriver overload prevention means

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9221158
APP PUB NO 20140033882A1
SERIAL NO

14005374

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power screwdriver overload prevention means (100), which is arranged between an input drive part (110) and an output drive part (102, 121) and which interrupts the transmission of torque between the input drive part (110) and the output drive part (102, 121) when a threshold torque is exceeded, is characterized in that the input drive part (110) has at least one ring of balls (130) that is arranged in a rotationally fixed manner in the input drive part, in that the output drive part (102, 121) has at least one ring of balls (140; 141, 142) that is arranged in a rotationally fixed manner in the output drive part (102, 121), and in that the ring of balls (130) that is arranged in the input drive part (110) is spring-preloaded via the ring of balls (140; 141, 142) arranged in the output drive part (102, 121) such that the balls (130) of the input drive part (110) are located in each case between two balls (140; 141, 142) of the output drive part (102, 121) and thus transmit a torque, and such that, when the threshold torque is exceeded, the balls (130) of the input drive part (110) roll over the balls (140; 141, 142) of the output drive part (102, 121) and thus interrupt the transmission of torque.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOESOMAT-SCHRAUBTECHNIK NEEF GMBHBERTHA-BENZ-STRASSE 12 VAIHINGEN/ENZ 71665

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wilczek, Klaus Ehningen, DE 15 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00