Rotating parking brake control device for construction machinery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9212467
APP PUB NO 20130060432A1
SERIAL NO

13582389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosed rotating parking brake control device obviates the need for an operator to operate an emergency-stop switch. A hybrid controller, to which a brake is connected, outputs a drive control signal to a rotating electric motor to control drive of an upper rotating body and also controls the brake by generating a brake release command signal and outputting the brake release command signal to the brake. A pump controller also generates a brake release command signal, and the brake release command signal generated by the pump controller is transmitted to the hybrid controller through an inter-controller signal line. The brake release command signal is outputted to the brake only when the brake release command signal is generated by the hybrid controller and the brake release command signal is transmitted from the pump controller through the inter-controller signal line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU LTD2-3-6 AKASAKA MINATO-KU TOKYO 107-8414 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akushichi, Shuki Kanagawa, JP 10 178
Morinaga, Jun Kanagawa, JP 32 407
Take, Hiroaki Kanagawa, JP 6 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00