Visual display system and method of constructing a high-gain reflective beam-splitter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9211481
APP PUB NO 20140026384A1
SERIAL NO

13559828

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of making a remarkably bright high-gain reflective beam-splitter is presented. Each non-glued together touching layer of the multilayered film of the beam splitter has front and back reflective surfaces that additively increase the brightness. The system can include tables, step-down shelves, cutting bars, gripper units, tension units, a frame, a hoist assembly, and dollies. Constructing the beam-splitter can use grippers that slip slightly, as a function of applied tensioning force, along the trimmed edges of the multilayered film. This slip gripping scheme can result in constructing substantially coplanar sheets of the multilayered film that touch each other face to face and result in removing most of the air between the sheets. The planar integrity of the multilayered film of the high-gain reflective beam-splitter can be maintained at almost any desired display angle even when the high-gain reflective beam-splitter is as large as a standard theatrical stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NB TECH INC185 LOWER RIDGE ROAD CONWAY AZ 72032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baker, Gary Conway, US 56 840

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00