Power supply without using electrolytic capacitor at input side

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9209699
SERIAL NO

14613410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply is provided, including a bridge rectifier, a film capacitor and a DC-to-DC converter. The bridge rectifier rectifies an input voltage of an AC power supply to produce a full-wave rectified voltage. The film capacitor filters the full-wave rectified voltage to produce a first pulsating DC voltage. A control circuit of the DC-to-DC converter attenuates the first pulsating DC voltage to produce a second pulsating DC voltage, detects a peak value and a valley value of the second pulsating DC voltage, and produces an OCP compensation value of −(Vx−VH)+PH accordingly, where Vx refers to the second pulsating DC voltage, VH refers to the valley value, and PH refers to the peak value. The control circuit provides an OCP function and a constant output power limitation for the DC-to-DC converter according to a compensated OCP setting value produced by adding the OCP compensation value to an OCP setting value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXCELLIANCE MOS CORPORATION4F -1 NO 22 TAIYUAN ST ZHUBEI CITY HSINCHU COUNTY 302

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Sheng Chieh Zhubei, TW 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00