Method for microbially generating electricity and microbial power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9209475
APP PUB NO 20110256427A1
SERIAL NO

12998964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To increase the power generation efficiency of a microbial power generator by using an easy and inexpensive unit. Two plate-like cation-exchange membranes 31 are disposed in parallel in a tank 30. This arrangement allows an anode chamber 32 to be formed between the cation-exchange membranes 31. Two cathode chambers 33 are separated from the anode chamber 32 by using the respective ion-permeable nonconductive membranes 31. An oxygen-containing gas is made to pass through the cathode chamber 33. An anode solution L is supplied to the anode chamber, and, preferably, the anode solution is made to circulate. A biologically treated exhaust gas is used as the oxygen-containing gas to be supplied to the cathode chamber 33. Carbon dioxide in the biologically treated exhaust gas can promote transport of Na+ and K+ ions, and water vapor can increase the ion permeability, thereby increasing the power generation efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KURITA WATER INDUSTRIES LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukase, Tetsuro Tokyo, JP 12 58
Komatsu, Kazunari Tokyo, JP 16 230
Orita, Nobuhiro Tokyo, JP 17 101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00