Frame connector assembly for large portable frameworks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9206824
SERIAL NO

13851757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A frame connector assembly is configured to releasably, rigidly, and safely join large frame members to one another to form temporary structures. A connector assembly typically comprises a housing, a hoop element, a first cam block, a second cam clock and a rotatable actuator adapted to be engaged by a torquing tool. The housing is secured within the first frame member. Rotation of the actuator causes the threadedly-engaged second cam element to force movement of the first cam element in a direction opposing a spring bias. The hoop element is resultingly pulled toward the housing, along with a cleat or other detent element which is affixed to the second frame member. The housing can be manufactured inexpensively by way of extrusion. The frame connector assembly is adaptable to facilitate rapid construction and disassembly of various frame joint configurations, including end-to-face joints, and mitered 90-degree joints.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TWIN BROOK CAPITAL PARTNERS LLC AS AGENT300 SOUTH WACKER DRIVE SUITE 3500 CHICAGO IL 60606

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frey, Robert Salt Lake City, US 5 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00