Elevated frog and rail crossing track assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9206556
APP PUB NO 20140034788A1
SERIAL NO

14047762

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crossing panel includes a pair of intersecting rails, a pair of crossing line rails, a plurality of railroad ties supporting the crossing line rails such that the crossing line rails are angled upwardly from a base elevation toward the respective main line rail and terminating such that a tread bearing surface of each crossing line rail at its terminal end is at a height above the crown of the intersecting line rail, an external frog casting being aligned with and secured to the terminal ends of the crossing line rails and having an external frog tread bearing surface substantially above the crown of an intersecting line rail, and transitional guide castings disposed between the intersecting rails and respectively aligned with the crossing line rails. The transitional guide castings are substantially horizontal, and each has a crown maintained at a height sufficient to maintain a railcar wheel of a train wheel set above the intersecting line rails.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLEVELAND TRACK MATERIAL INCCLEVELAND OH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Remington, James A Sheffield Village, US 39 161
Voelkerding, Dan Cleveland, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00