Stator for rotating machine, holder for use with stator, rotating machine, and automobile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9203275
APP PUB NO 20130106250A1
SERIAL NO

13667653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stator of a rotating machine includes a stator core, a plurality of winding wires wound on the stator core, a first bus ring, a second bus ring, and a holder device. The first bus rings each has a first radial dimension and selectively connects electrically with each of the wires. The second bus ring has a second radial dimension different from the first radial dimension and selectively connects electrically with each of the wires. The holder device holds the first and the second bus rings. The holder device includes a first and a second support portion. The first support portion supports a plurality of the first bus rings aligned along an axial direction of the stator core. The second support portion supports the second bus ring on a radially outward or inward side of the first bus rings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 1050023 JAPAN
TOSHIBA INDUSTRIAL PRODUCTS MANUFACTURING CORPORATION2121 OAZANAO ASAHI-CHO MIE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Wataru Mie, JP 220 3907
Kanada, Kazuma Mie, JP 1 8
Kato, Hironori Mie, JP 91 665

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00