Composite metal oxide, process for producing the composite metal oxide, positive active material for sodium secondary battery, positive electrode for sodium secondary battery, and sodium secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9203088
APP PUB NO 20140014873A1
SERIAL NO

13883172

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are: a composite metal oxide with which it is possible to improve the performance of a sodium secondary battery; a process for producing the composite metal oxide; a positive active material which comprises the composite metal oxide; a positive electrode produced using the positive active material; and a sodium secondary battery including the positive electrode. The composite metal oxide is represented by the following formula: NaxFeyMn1-yO2. The composite metal oxide is constituted of an oxide having a P2 structure and a lamellar oxide, with some extent of stacking faults, having an octahedral structure and/or a triangular-prism structure. The lamellar oxide preferably is an oxide having an O3 structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO UNIVERSITY OF SCIENCE EDUCATIONAL FOUNDATION ADMINISTRATIVE ORGANIZATIONSHINJUKU-KU TOKYO 162-8601

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwatate, Junichi Tokyo, JP 1 6
Komaba, Shinichi Tokyo, JP 20 108
Yabuuchi, Naoaki Tokyo, JP 18 171

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00