Elastomeric nanocomposites, nanocomposite compositions, and methods of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9200152
APP PUB NO 20120190772A1
SERIAL NO

13013551

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elastomeric nanocomposite contains: (a) at least one elastomer comprising units derived from isoolefins having from 4 to 7 carbon atoms; (b) at least 10 phr of a carbon black; and (c) at least 1 phr of a nanoclay; wherein when the nanocomposite is used in an article, the article has a gas permeation coefficient of 80.0 cc*mm/[m2-day] at 40° C. The carbon black may be graphitized to reduce interactions between the carbon black and the nanoclays. The elastomeric nanocomposite may, with or without the use of the graphitized carbon black, may calendared or extruded in such a manner as to orient the nanoclay platelets within the composition such that the oriented nanoclay elastomer nanocomposite has an orientation parameter of greater than 0.15.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL CHEMICAL PATENTS INC13501 KATY FREEWAY HOUSTON TX 77079

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johnston, Molly W Baytown, US 3 64
Rodgers, Michael B Seabrook, US 20 202
Soisson, John P Houston, US 7 8
Webb, Robert N Kingwood, US 14 68
Weng, Weiqing Houston, US 50 1442

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00