Method for producing ornament

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9199413
APP PUB NO 20130228277A1
SERIAL NO

13882699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In this method for producing an ornament (1), wherein an ornamental sheet (3) is bonded/affixed by means of a vacuum-press-bonding method to the convex front surface (21) of a substrate (2) provided with a convex front surface (21) and a concave back surface (22), a work-support base (6) is placed on a work placement surface (121a) formed on the upper surface of the suction chamber (120) of a vacuum-press-bonding device (100), and the substrate (2) is positioned by fitting an engagement protrusion (28) formed on the back surface of the substrate (2) covered by the ornamental sheet (3) to an engagement hole (68) at the work-support surface (61) formed on the upper surface of the work-support base (6). When bonding/affixing the ornamental sheet (3) to the substrate (2) by means of the vacuum-press-bonding device (100), position deviation of the substrate (2) is prevented by the engagement of the engagement hole (68) and the engagement protrusion (28).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIGEN INCMATSUMOTO-SHI NAGANO 399-0014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuya, Eiji Nagano, JP 7 10
Komatsu, Kei Nagano, JP 1 1
Ono, Kazutaka Nagano, JP 90 778

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00