High-voltage heavy-current drive circuit applied in power factor corrector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9190897
APP PUB NO 20140293664A1
SERIAL NO

14358566

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-voltage heavy-current drive circuit applied in a power factor corrector, comprising a current mirroring circuit (1), a level shift circuit (3), a high-voltage pre-modulation circuit (2), a dead time control circuit (4) and a heavy-current output stage (5); the heavy-current output stage adopts a Darlington output stage structure to increase the maximum operating frequency of the drive circuit. The stabilized breakdown voltage characteristic of a voltage stabilizing diode is utilized to ensure the drive circuit operating within a safe voltage range. Adding dead time control into the level shift circuit not only prevents the momentary heavy-current from a power supply to the ground during the level conversion process, but also reduces the static power consumption of the drive circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CSMC TECHNOLOGIES FAB2 CO LTD214028 NO 8 XINZHOU ROAD NATIONAL HI TECH INDUSTRIAL DEVELOPMENT ZONE WUXI JIANGSU WUXI CITY JIANGSU PROVINCE 214028

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yue Jiangsu, CN 222 2240
Dai, Guoding Jiangsu, CN 2 9
Han, Hui Jiangsu, CN 58 204
Ma, Renyue Jiangsu, CN 1 5
Ma, Xiaohui Jiangsu, CN 40 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00