Component with filament connection and process for the production of a component with filament connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9188739
APP PUB NO 20140072757A1
SERIAL NO

14022380

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a component with filament connection, in particular for communication, in particular for optical communication comprising:

    a voluminous material,a substrate,a filament anda connection component applied on the filament,where the filament has been embedded in the substrate and, at a transition point, emerges from the substrate and proceeds into the voluminous material. According to the invention, the voluminous material directly encloses the filament from the transition point and directly encloses the connection component applied on the filament and has full-area inseparable bonding to the substrate, where the voluminous material is a fully crosslinked voluminous material formed from a pliable material and the substrate has been hardened.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E VMUNICH
TECHNISCHE UNIVERSITAT DARMSTADT64289 DARMSTADT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Laveuve, Dominik Darmstadt, DE 2 2
Schwarzhaupt, Oliver Frankfurt, DE 2 1
Wyrwich, Katrin Runkel, DE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00