Retardation element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9181479
APP PUB NO 20110293856A1
SERIAL NO

13133489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A retardation element containing a liquid crystalline compound, and at least one compound selected from the group consisting of a compound represented by the following formula (1), a compound represented by the following formula (2) and a compound represented by the following formula (3). In the formula (1), n represents an integer of 3 to 10 and R2 represents a —CH2—CH2— group, a —CH2—CH(CH3)— group or a —CH2—CH2—CH2— group. In the formula (2), R3 represents a —(CH2)p— group or a phenylene group and p represents an integer of 4 to 8. In the formula (3), R4 represents a substituted phenylene group. In the formulas (1) to (3), R1-1, R1-2 and R1-3 each represent an alkyl group having a branched structure having 5 or more carbon atoms and R1-1, R1-2 and R1-3 may be the same or different.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEKISUI CHEMICAL CO LTDOSAKA JAPAN OSAKA
NIPPON KAYAKU CO LTD1-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukatani, Juichi Shiga, JP 66 681
Ichikawa, Seiko Shiga, JP 5 29
Kameda, Mayu Tokyo, JP 4 27
Omoto, Izumi Shiga, JP 7 71
Tanaka, Kouichi Tokyo, JP 111 1386

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00