Multi-carrier integration apparatus for distributed antenna system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9179501
APP PUB NO 20140233435A1
SERIAL NO

13836126

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A band combiner unit includes a plurality of carrier modules (CMs) each configured to be connected to a base transceiver station (BTS) or bi-directional amplifier (BDA) for corresponding ones of the carriers, wherein each of the CMs is configured to transmit downlink signals from the corresponding BTS/BDA, adjust the downlink signals, and transmit the downlink signals to a first combiner, and to receive uplink signals from a second combiner, adjust the uplink signals, and transmit the uplink signals to the corresponding BTS/BDA, the first combiner configured to combine the downlink signals from the CMs, and transmit the combined downlink signals to a distributed antenna system (DAS), the second combiner configured to split a combined uplink signal from a DAS, and transmit the split uplink signals to corresponding ones of the CMs, and a band combiner unit controller for monitoring and controlling the CMs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED RF TECHNOLOGIES INC3116 WEST VANOWEN STREET BURBANK CA 91505

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ko, Young-Hoon Icheon, KR 29 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00