Electrical frequency converter for coupling an electrical power supply grid with an electrical drive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9178443
APP PUB NO 20130235624A1
SERIAL NO

13672970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical frequency converter for coupling an electrical power supply grid with an electrical drive includes a first power converter connected to the power supply grid. The first power converter includes at least two connections in series. A second power converter is connected to the electrical drive and includes at least two connections in series. Each of the connections in series of the first and second power converters includes at least two modular switches. Each modular switch includes a first connection in series having a first controllable power semiconductor component and a first diode. The modular switch further includes a second connection in series having a second controllable power semiconductor component and a second diode. The modular switch further includes a capacitor. The first connection in series, the second connection in series and the capacitor are connected in parallel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE ENERGY POWER CONVERSION GMBHBERLIN GERMANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Janning, Jörg Berlin, DE 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00