Membrane bioreactor with reduced air scour requirements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9174862
SERIAL NO

13373284

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a sewage treatment plant with a membrane bioreactor (MBR), raw untreated or partially treated wastewater (influent) and/or mixed liquor in the intensified process is superoxygenated. In a preferred form of the process the influent is superoxygenated such that membrane air scouring requirements are reduced. Influent may be fed to a swing zone where denitrification and nitrification occur simultaneously through process control. In one embodiment superoxygenation is conducted in an internal recycle stream of the mixed liquor, with oxygen content supersaturated preferably to over 300 parts per million. Due to the active evolution of oxygen gas from the supersaturated stream, occurring preferably by seeding the supersaturated stream with air bubbles, the supersaturated oxygen can serve the dual purposes of meeting process oxygen demands and providing part of air scouring requirements for the membranes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OVIVO INCMONTREAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Elena Cedar Park, US 8 42
Livingston, Dennis Austin, US 10 33
Porteous, James Austin, US 7 220

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00