Single loop multistage fuel production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9169166
APP PUB NO 20140199213A1
SERIAL NO

14156154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Synthetic fuels are produced from synthesis gas in a four-stage reactor system with a single recycle loop providing the requisite thermal capacity to moderate the high heat release of the reactions and to provide the reactants and reaction environments for the efficient operation of the process. The first reactor converts a portion of the synthesis gas to methanol; the second reactor converts the methanol to dimethylether; the third reactor converts the methanol and dimethylether to fuel; and the fourth reactor converts the high melting point component, durene, and other low volatility aromatic components such as tri- and tetra-methylbenzenes to high octane branched paraffins. A large part of the gas stream of the fourth reactor is recycled to the inlet of the first stage and mixed with the fresh synthesis gas stream. Alternatively, the fresh synthetic gas stream is mixed with the product of the second stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUESCAPE CLEAN FUELS LLC219 HOMESTEAD ROAD HILLSBOROUGH NJ 08844

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben-Reuven, Moshe Princeton, US 7 23
Boyle, Richard E Philadelphia, US 2 15
Fang, Howard L Bridgewater, US 11 71
Koros, Robert M Westfield, US 20 269

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00