Geographically stable floating platform structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9168987
SERIAL NO

14156735

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Proposed is a floating platform structure for use on the surface of the ocean in equatorial regions where a strong eastward Cromwell current exists below the westward surface current. In the present invention, the forces developed by these two opposite currents are used for maintaining the floating structure in a stable geographical position that may be important, e.g., for launching a satellite-carrying rocket. The structure contains a rigid three-dimensional frame, which is immersed to the depth of the Cromwell current and carries floating bodies that experience the effect of the Cromwell current for counterbalancing the dragging force applied to the structure in the opposite direction from the surface current. Vertical positions of the floating bodies are adjustable by a mechanism, the operation of which is controlled on the basis of signals obtained from GPS, which locates the geographical position of the floating structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHARAPOV SERGEYNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sharapov, Sergey San Francisco, US 7 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00