Method for manufacturing nonvolatile semiconductor storage device and nonvolatile semiconductor storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9166164
APP PUB NO 20140377932A1
SERIAL NO

14482893

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a nonvolatile semiconductor storage device according to an embodiment includes laminating a first wire extending in a first direction, and a film made into a variable resistance element made of a metallic material, which are laminated in order on a semiconductor substrate, dividing, into a plurality of pieces, the film made into the variable resistance element, in the first direction and a second direction, forming an interlayer insulating film between the plurality of pieces formed by dividing the film made into the variable resistance element in the second direction, and oxidizing the metallic material of the film made into the variable resistance element, and laminating an upper electrode and a second wire extending in the second direction, which are laminated in order on the film made into the variable resistance element and the interlayer insulating film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA72 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI A CORP OF JAPAN TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanaka, Toshiharu Yokkaichi, JP 87 732

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00