Fluid diverter system for a drilling facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9163466
APP PUB NO 20140166360A1
SERIAL NO

14129452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid diverter system for a drilling facility comprises a diverter housing (15; 15′) fluidly connected to a tubular (3, 42, 43) extending to a subsea well. The diverter housing (15; 15′) comprising a movable diverter element (2) for closing off the diverter housing, a first fluid conduit (44) connected to a mud system and comprising a first valve (5), at least one second fluid conduit (20; 20′) leading from an outlet (46; 46′) in the diverter housing to an overboard location and comprising a second valve (1; 48), and a third fluid conduit (16) connected to a mud/gas separator (MGS) (13) and comprising a third valve (4). The MGS (13) is arranged below the outlet (50) of the diverter line, whereby riser fluids may be fed from the diverter housing (15) to the MGS (13) by means of gravity flow. The diverter valve (1; 48) on a leeward side of the drilling facility is configured to be open before the diverter element (2) closes around the tubular (3).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MHWIRTH ASPOSTBOKS 413 LUNDSIDEN KRISTIANSAND S 4604

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vavik, Dag Kristiansand, NO 6 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00