Synthesis reaction system for hydrocarbon compound, and method of removing powdered catalyst particles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9162170
APP PUB NO 20110044859A1
SERIAL NO

12736108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A synthesis reaction system is provided with: a reactor which synthesizes a hydrocarbon compound by a chemical reaction of a synthesis gas including hydrogen and carbon monoxide as main components, and a slurry having solid catalyst particles suspended in liquid; a separator which separates the hydrocarbon compound from the slurry; and a filtering device which filters the hydrocarbon compound extracted from the separator to trap powdered catalyst particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COSMO OIL CO LTD1-1-1 SHIBAURA MINATO-KU TOKYO 105-8528
JAPAN OIL GAS AND METALS NATIONAL CORPORATION2-10-1 TORANOMON MINATO-KU TOKYO 105-0001
JX NIPPON OIL & ENERGY CORPORATION6-3 OTEMACHI 2-CHOME CHIYODA-KU TOKYO 100-8162
JAPAN PETROLEUM EXPLORATION CO LTD7-12 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 1000005 ?1000005
NIPPON STEEL ENGINEERING CO LTD5-1 OSAKI 1-CHOME SHINAGAWA-KU TOKYO 1418604 ?1418604
INPEX CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Yuzuru Tokyo, JP 19 44
Murata, Atsushi Tokyo, JP 69 337
Onishi, Yasuhiro Tokyo, JP 37 680
Yamada, Eiichi Tokyo, JP 74 1001

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00