Continuous cellulostic pre-treatment and bio-mass processing by reactive extrusion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9161556
APP PUB NO 20120125324A1
SERIAL NO

13365325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Cellulosic materials are treated with Supercritical Carbon Dioxide in an extruder. Machine configuration and operating parameters are strictly controlled in a manner to enhance the ability of Supercritical CO2 to enter into the cells. This results in a controlled deterioration of the cell walls, increasing the reactivity of cellulose and also enhancing the rate and the extent of cellulose hydrolysis. This precisely controlled combination of pressure, shear & temperature accelerates the penetration of carbon dioxide molecules into the crystalline structures, thus more glucose is produced from cellulosic materials after the cell is destructurized as compared to those without the pretreatment increasing glucose yield by as much as 50%. Concurrent saccharification and fermentation tests also show the increase in the available carbon source from the cellulosic materials for fermentation to produce ethanol. As the system operates at low temperature, it will not cause degradation of sugars such as those treated with the high-temperatures involved in many systems discussed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FISK DONALD LNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fisk, Donald L Rolla, US 3 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00