Waste heat recovery structure for steel making electric arc furnaces, steel making electric arc furnace facility, and waste heat recovery method for steel making electric arc furnaces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9157336
APP PUB NO 20120320941A1
SERIAL NO

13581322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A waste heat recovery structure includes a first exhaust gas flow path provided to each of steel making electric arc furnaces to discharge exhaust gas thereinto; a waste heat boiler disposed on the first exhaust gas flow path to recover waste heat as saturated steam from exhaust gas; a steam accumulator configured to store steam formed by confluence of saturated steam parts, each generated by the waste heat boiler; a steam super heater configured to turn steam into superheated steam by heating; a second exhaust gas flow path configured to lead exhaust gas from the waste heat boiler to the steam super heater to use it for superheating; a third exhaust gas flow path configured to discharge exhaust gas from the waste heat boiler not through the steam super heater; and a switching device configured to switch flow paths between the second and third exhaust gas flow paths.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JP STEEL PLANTECH COKOHOKU-KU YOKOHAMA 222-0033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujikura, Nobuyuki Yokohama, JP 7 83
Okuyama, Yoshinori Yokohama, JP 1 2
Wakahara, Keiji Yokohama, JP 44 726
Watanabe, Masayuki Yokohama, JP 174 2113
Yamazaki, Masanari Yokohama, JP 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00