Power takeoff lubrication devices and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9151336
APP PUB NO 20130228411A1
SERIAL NO

13785633

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Power takeoff lubrication devices and methods are disclosed. Embodiments include an accumulator connected to a power takeoff fluid supply line and storing fluid (which may be under pressure) for selective use independent of the fluid being supplied by the fluid supply line. In some embodiments, the fluid in the accumulator is supplied to various components within the power takeoff, including the clutch plates (which may have fluid supplied prior to and/or during engagement), which can decrease wear and/or clutch temperature. In some embodiments, the fluid in the accumulator is supplied to the clutch piston to actuate the clutch piston when the pressure in the supply line is less than optimal and/or to stabilize the pressures in the hydraulic lines connected to the clutch piston. In still further embodiments, the fluid in the accumulator is supplied to the clutch when the fluid supply line pressure is less than optimal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MUNCIE POWER PRODUCTS INC201 E JACKSON STREET SUITE 500 MUNCIE IN 47305

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wesley, Larry Springport, US 1 8
Young, Brian Tulsa, US 60 662

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00