Multi-connectors for extendable conveyors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9151311
APP PUB NO 20130233676A1
SERIAL NO

13782744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Multi-connectors for extendable conveyors are disclosed. An example multi-connector to connect an external component to an extendable conveyor is disclosed. The extendable conveyor is to convey articles and includes a base unit, a mechanically extendable section to be supported in a cantilevered manner and to be selectively positioned relative to the base unit, and a conveying surface to convey articles. The conveying surface is to extend at least partially on an upper side of the mechanically extendable section. The multi-connector includes a mechanical connection section to mechanically attach the external component, a fastening section to fasten the multi-connector to the extendable conveyor, and a functional/powered connection section to provide at least one of electric power or a vacuum supply to the external component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALJAN A/SVED MILEPÆLEN 6 - 8 HASSELAGER 8361

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek,, IV Anders Stougaard Aarhus C, DK 4 87
Falk, Allan Horsens, DK 4 84
Nielsen, Brian Bondegaard Horsens, DK 4 84
Oestergaard, Mads Viby J, DK 4 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00