Method of manufacturing weaved preform with oriented weft yarns

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9150985
APP PUB NO 20140283944A1
SERIAL NO

14355997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a fiber preform, including forming a weaved preform fabric with a connection zone and multiple layers extending therefrom, each layer having an edge attached to the connection zone with a remainder of the layers extending freely from each other and from the connection zone, the attached edges being parallel and adjacent one another, each of the layers having a weaved structure including warp yarns extending at least substantially parallel to the attached edges and weft yarns extending at least substantially perpendicularly to the warp yarns, deforming at least one of the layers along a direction at least substantially parallel to the warp yarns until the weft yarns thereof have a corresponding desired orientation with respect to the warp yarns, and attaching the layers together away from the attached edges. A method of forming a weaved preform fabric for a fiber preform is also discussed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GROUPE CTT INC3000 RUE BOULLE ST-HYACINTHE J2S 1H9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juillard, Nicolas Montreal, CA 1 3
Levesque, Jonathan Mont Saint-Hilaire, CA 3 40
Vermeersch, Olivier Guy Robert St-Hyacinthe, CA 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00