Hollow, composite-material rebar fabrication methodology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9149993
APP PUB NO 20140332158A1
SERIAL NO

14447496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making an elongate, composite-material, hollow rebar structure including (a) forming an elongate, composite-material, hollow core, (b) in association with such forming, preparing along the core's length an elongate, composite-material, core-circumsurrounding, hollow sleeve having inner and outer surfaces, (c) in association with such preparing, creating, unitarily with the sleeve, and in a manner distributed along the length of the sleeve's outer surface, an external-purchase-enhancing structure possessing radial-dimensionality, and (d) bonding the inner surface of the sleeve to the outer surface of the core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPOSITE REBAR TECHNOLOGIES INC16200 SW PACIFIC HWY SUITE H170 PORTLAND OR 97224-4053

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garber, Trent J Albany, US 6 35
Gibson, Robert C Madison, US 17 101
Hershberger, Thomas A Madison, US 8 185
Noble, Matthew H Lebanon, US 6 35
Ohnstad, Thomas S Salem, US 52 333

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00