Fiber reinforced cement based mixed material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9145337
APP PUB NO 20140326168A1
SERIAL NO

14359071

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a fiber reinforced cement based mixed material having high tensile strength and high toughness, the mixed material comprising a cementitious composition with fast development of early strength; a small hydration heat temperature; and a small shrinkage during curing. The fiber reinforced cement based mixed material contains 100 wt. parts of cement, 5-30 wt. parts of silica fume, 30-80 wt. parts of at least one pozzolanic material excluding the silica fume, 5-25 wt. parts of limestone powder, at least one chemical admixture, water, 70-150 wt. parts of aggregate having a largest aggregate diameter of 1.2-3.5 mm, and fibers, wherein at least some of the fibers comprise a fiber having asperities formed in the surface, the fiber having asperities being formed such that a ratio (h/H) of a depth h of each of recessed portions among the asperities to a smallest cross-sectional diameter H thereof is 0.05-0.8.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAISEI CORPORATIONSHINJUKU-KU TOKYO 163

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Osamu Tokyo, JP 48 330
Nishi, Kazuhiko Tokyo, JP 19 281
Sakamoto, Jun Tokyo, JP 45 229
Tanaka, Yoshihiro Hino, JP 125 1284

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00