Power plug capable of simple assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9142906
APP PUB NO 20140073200A1
SERIAL NO

13941571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plug for connecting with a power outlet includes at least two metal connecting poles, two outputting cavities, and two conductive resilient sheets. The two outputting cavities are defined in a lower case of the power plug to connect an external device. The two conductive resilient sheets are received within an inner space of the power plug. The at least two metal connecting poles pass through an exterior surface of the power plug into the internal space to form two connecting terminals. Each of the conductive resilient sheets is connected between one of the two connecting terminals and a corresponding outputting cavity to transport electrical power from the power jack to the external device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI
FU TAI HUA INDUSTRY (SHENZHEN) CO LTDAREA B FOXCONN GUANLAN TECHNOLOGY PARK DASAN COMMUNITY GUANLAN SUB-DISTRICT SHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zhou Shenzhen, CN 55 259
Chou, Che-Yu New Taipei, TW 23 286
Ge, Hai-Qian Shenzhen, CN 19 161
Guo, Ji-Bing Shenzhen, CN 22 195
Huang, Qun Shenzhen, CN 36 240
Jiang, Tao Shenzhen, CN 533 4605
Lan, Wen-Chih New Taipei, TW 12 91
Shi, Zhi-Jun Shenzhen, CN 13 95
Wang, Hua-Yong Shenzhen, CN 20 192
Yu, Wei-Wei Shenzhen, CN 15 98
Zhang, Jun-Liang Shenzhen, CN 19 96
Zhu, Tai-Shan Shenzhen, CN 27 182

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00