Collagen/hydroxyapatite composite scaffold, and process for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9138483
APP PUB NO 20130177648A1
SERIAL NO

13786891

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a collagen/hydroxyapatite (HA) composite scaffold comprises the steps of forming a homogenous suspension of collagen and HA in an acidic solution, lyophilizing the suspension until a desired final freezing temperature is reached to produce the composite scaffold, and optionally cross-linking the composite scaffold, wherein the ratio of HA to collagen is at least 1:10 (w/w). Also provided is a collagen/hydroxyapatite (HA) composite scaffold comprising a homogenous distribution of hydroxyapatite within a porous, crosslinked, collagen matrix, wherein the ratio of HA to collagen is at least 1:10 (w/w). Suitably, the composite scaffold has a porosity of at least 99% (v/v), and a compressive stiffness of at least 0.3 KPa. Composite scaffolds of the invention may be used to provide osteoconductive bone implants and tissue engineering implants.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROYAL COLLEGE OF SURGEONS IN IRELAND123 ST STEPHENS GREEN DUBLIN D2

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gleeson, John Patrick Dublin, IE 2 25
O'Brien, Fergal Joseph Dublin, IE 2 25
Plunkett, Niamh Dublin, IE 2 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00